top of page

SECURE  NATIONAL HALL

Project includes:
  • Construction of two new Security Screening Check Points (SSCP’s) to facilitate the removal of the existing Security Screening Check Points located at each Concourse within the existing Airport. 

  • The new Security Screening Check Points are additions that will be constructed over the existing arrivals roadway 

  • The work entails full architectural fit out and finishes, MEP and Special Systems required for a complete and operational screening check point. 

  • North and South check points

  • Improves Passenger Flow by: 

– Improving the escalators and elevators

– Routing to the gate

– Routing from the Metro to ticketing and security screening checkpoints​

– Removes barriers to movement between airline gates

  • Structural, architectural, MEP, security and specialty trade renovations.

bottom of page